Shenzhen PM-9000 Express Manual del operador Pagina 167

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 339
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 166
11.7 Maintenance and Cleaning
WARNING
Before cleaning the ECG cable, be sure to disconnect the monitor from the ECG
cable, or shut down the system and disconnect all power cords from the outlet.
If the ECG cable is damaged or aged, replace with a new one.
Cleaning
The exterior surfaces of the ECG cable may be cleaned with a soft cloth, dampened with the
alcohol, and then be air-dried or dried with a clean dry cloth.
Disinfection
Disinfection may cause damage to the equipment. We recommend the disinfection be
contained in the hospital’s servicing schedule only when necessary. The equipment should be
cleaned prior to disinfection.
Sterilization
Sterilization may cause damage to the equipment. We recommend the sterilization be
contained in the hospital’s servicing schedule only when necessary. The equipment should be
cleaned prior to sterilization.
11-29
Vista de pagina 166
1 2 ... 162 163 164 165 166 167 168 169 170 171 172 ... 338 339

Comentarios a estos manuales

Sin comentarios